Summary of 05 tekening strookfundering dragende vloer

This is an AI generated summary. There may be inaccuracies.
Summarize another video · Purchase summarize.tech Premium

00:00:00 - 00:10:00

This video explains how to draw a floor plan for a building. It begins by explaining the layout of a typical building, then draws the floor plan on a larger scale. Finally, it highlights the contours of the floor plan and uses them to create the final drawing.

  • 00:00:00 In this video, the creators explain how to create a drawing of the strokenfundering, which they learned earlier in combination with the dragende betonvloer. There are two types of flooring to be added to a beginning ground floor - the vrijdragend vloer and the traag vloer. The vrijdragend vloer is started directly on firm ground, while the traag vloer is moved along a fixed wall. The vrijdraaien vloer is placed on the wall opposite the dragende vloer. Here, we'll take a brief break to return later and discuss the traag vloer, but first we'll create the horizontal and vertical lines for the dragende vloer. The horizontal line is located 67 millimeters from the top edge of the drawing sheet and runs towards the inside of the wall. The vertical line is located 93 millimeters from the bottom edge of the drawing sheet and runs towards the outside of the wall. We then create the lines for the spouwmuurisolatie. The horizontal line is located 100 millimeters from the outside of the wall and the vertical line is located 140 millimeters from the outside of the
  • 00:05:00 This video shows how to draw a floor using drawings of concrete blocks. This is because it is a cheap way to achieve a level of stability against water and they can last up to three layers under the ground. For each block that is drawn, the dimensions are 100 x 200 mm thick. The block is 20 cm high, 30 cm long and 20 cm wide. The top lines that were drawn in the past are used as a guide to create the concrete block in the present. However, the block is now 200 mm high and the business will just draw the blocks. In relation to the 50 mm below the ground, the first layer of concrete will be poured, followed by a layer of insulation made of polyester film. This is then followed by a layer of mineral wool. Next, a layer of sand is poured over the insulation and the mineral wool. This is then sealed with a layer of polyester film. Finally, the floor is finished by pouring a cementitious layer on top. The floor is then finished by applying a coat of paint. In this case, the floor is finished in green mineral wool. The coating prevents moisture from entering the concrete blocks when it is still wet, which is important when completing the floor later on. The exterior surfaces of the
  • 00:10:00 This video explains how to draw a floor plan. First, the video explains the layout of a typical building - including the parking lot, the sidewalk, and the building itself. The floor plan is then drawn on a larger scale, with thicker lines to show the detail. Finally, the contours of the floor plan are highlighted and used to create the final drawing.

Copyright © 2024 Summarize, LLC. All rights reserved. · Terms of Service · Privacy Policy · As an Amazon Associate, summarize.tech earns from qualifying purchases.