This is an AI generated summary. There may be inaccuracies.
Summarize another video · Purchase summarize.tech Premium
The video shows the progress made on rebuilding "The Salvage Cave," which was destroyed in a fire. All the outlets along the back wall and the wiring for the lift are installed. The next step is to run the conduit up into the ceiling and install two outlets there. There are also two outlets between most of the doors, one up top and one down below.
Copyright © 2024 Summarize, LLC. All rights reserved. · Terms of Service · Privacy Policy · As an Amazon Associate, summarize.tech earns from qualifying purchases.